Here is your pdf: Approaches, driveways and public walks Flat Work

The length of the document below is: 2 page(s) long

The self-declared author(s) is/are:

www.wdundee.org

The subject is as follows:
Subject: Original authors did not specify.

The original URL is: LINK

The access date was:
Access date: 2019-04-10 15:08:27.035023

Please be aware that this may be under copyright restrictions. Please send an email to admin@pharmacoengineering.com for any AI-generated issues.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

The content is as follows:

APPROACHES & DRIVEWAYS PUBLIC SIDEWALKS

BUILDING DEPARTMENT

PERMIT REQUIREMENTS

REQUIREMENTS:

1. A completed permit application.

2. A plat of survey indicating location of work to be done.

3. Indicate type of driveway to be installed.

4. Homeowners Association approval letter if applicable.

GENERAL GUIDELINES:

Driveways (see diagram on back

) Concrete driveways shall have five (5)

inches of compacted base (stone) and

five (5) inches of concrete.

Asphalt driveways shall have four (4

) inches of compacted base (stone) and two (2) inches of asphalt.

Approaches (see diagram on back

) Shall be concrete only, with five (5)

inches of compacted base (stone) and six

(6) inches concrete.

Public Sidewalks (see diagram on back

) Shall be concrete only, and have four

(4) inches of compacted base (stone) and

five (5) inches concrete.

Note: Public sidewalk between approach and dr

iveway shall have five (5) inches of

compacted base (stone) and six (6) inches of concrete.

REQUIRED INSPECTIONS:

Pre-pour Œ After forms are set, and prio

r to placing any concrete/asphalt/brick.

Final

Individual subdivision covenants