APPROACHES & DRIVEWAYS PUBLIC SIDEWALKS
BUILDING DEPARTMENT
PERMIT REQUIREMENTS
REQUIREMENTS:
1. A completed permit application.
2. A plat of survey indicating location of work to be done.
3. Indicate type of driveway to be installed.
4. Homeowners Association approval letter if applicable.
GENERAL GUIDELINES:
Driveways (see diagram on back
) Concrete driveways shall have five (5)
inches of compacted base (stone) and
five (5) inches of concrete.
Asphalt driveways shall have four (4
) inches of compacted base (stone) and two (2) inches of asphalt.
Approaches (see diagram on back
) Shall be concrete only, with five (5)
inches of compacted base (stone) and six
(6) inches concrete.
Public Sidewalks (see diagram on back
) Shall be concrete only, and have four
(4) inches of compacted base (stone) and
five (5) inches concrete.
Note: Public sidewalk between approach and dr
iveway shall have five (5) inches of
compacted base (stone) and six (6) inches of concrete.
REQUIRED INSPECTIONS:
Pre-pour Œ After forms are set, and prio
r to placing any concrete/asphalt/brick.
Final
Individual subdivision covenants